E.ON selects Capsol for carbon capture feasibility study in Norrköping
Oslo, Norway, June 15, 2026 - Capsol Technologies ASA has been awarded a feasibility study by E.ON to evaluate carbon capture solutions for E.ON's biomass and waste-to-energy operations in Norrköping, Sweden.
The study will assess the potential deployment of Capsol's carbon capture technology for a facility with a capture capacity of up to 500,000 tonnes of CO2 per year. The feasibility study will be executed together with a strategic engineering partner and builds on experience gained from similar carbon capture projects.
Capsol won the study through a competitive tender
